iQIntegrity ONE enables comprehensive recording of data for anonalies, defects and issues in a logical and straightforward format.

Add Defect

  1. Choose Date of creation
  2. Classification of Issue (optional): Anomaly, Defect, Critical Defect
  3. Discipline type, eg: Structural, Pipework, Vessels or Mechanical
  4. Corrosion Circuit or System number
  5. Installation Area, such as module number
  6. P&ID drawing number
  7. Isometric drawing number
  8. functional location, eg: 1m from bend
  9. Description of the defect/anomaly/issue
  10. Pipeline number
  11. Vessel number
  12. Line ID sequence
  13. Line Pressure
  14. Shutdown requirement, eg: unit, water injection or production
  15. Material composition of defect, such as carbon steel or stainless
  16. OIE recommendation
  17. Location notes
  18. Access requirements, eg: foot & floor, staging, scaffold

Defect Details

  1. Safety Critical: Yes/No
  2. Leaking: Yes/No
  3. Insulation: Yes/No
  4. Heat Traced: Yes/No
  5. Defect Type: External, Internal or Both
  6. Damage Found: select any or all of (example) types: Corrosion, Physical Damage, Vibrations, Insulation Damage etc
  7. Select Equipment type: eg Pipework, Secondary Steelwork, Valves, Flooring, Handrails etc
  8. select Component of that Equipment type: eg within Pipework select Reducer, Straight, Bend or Tee
  9. Defect description comments

Search: Basic (all filters may be combined)

  1. any text within
    1. MCDR
    2. Corrosion circuit
    3. Installation area
    4. Functional location
    5. Line ID
    6. P&ID
    7. ISO
    8. Vessel number
    9. PL number
  2. Find monitored MCDR’s: Yes/No/Both
  3. Find Closed MCDR’s: Yes/No/Both
  4. Discipline type: eg Pipework or Structural
  5. Material, eg Carbon Steel
  6. Safety Critical: Yes/No
  7. Hydrocarbon fluid defect: Yes/No (as defined in Corrosion Circ)
  8. Leaking: Yes/No
  9. Shutdown Requirement: Unit, Full, Water Injection, Production etc
  10. Action Party: eg Engineering, Maintenance etc
  11. Task Type: Replacement, Monitor, Temporary Repair (selection alters options in Date Range for filters)
  12. Date Range, from and to.
    Also additional selections to search within date based fields within Tasks, as set by Task type. For example, select Task type Temporary Repair and then select a date range and Deviation Expiry as the element to search on.
  13. Order Results by: default is by Reported Date/Descending and then by MCDR number/Descending – this shows the most recent records at the top. Example alternate settings may be list by Line ID, Module or Complete by Date.
  14. Export function to save result set as csv spreadsheet file
  15. Workpack option to export pdf formatted versions of the MCDR result list

Search: Advanced (all filters may be combined)

  1. Safety Critical: Yes/No/Either (Either = Yes or No)
  2. Leaking: Yes/No/Either
  3. Insulation: Yes/No/Both
  4. Heat Traced: Yes/No/Both
  5. Find Closed MCDR’s: No/Yes/All (both closed & open)
  6. Defect type: External/Internal/Both: Ext & Int/Either: Ext/Int or Both
  7. Damage Found: single/multi-select or all
  8. Equipment type/Component: example list all MCDR’s with all Pipework equipment types, or sub select only Pipework/Bends to limit response.
  9. Order Results by: default is by Reported Date/Descending and then by MCDR number/Descending – this shows the most recent records at the top. Example alternate settings may be list by Line ID, Module or Complete by Date.
  10. Export function to save result set as csv spreadsheet file
  11. Workpack option to export pdf formatted versions of the MCDR result list

Assessment

IE Assessment:

  • Assessment free text
  • Assessment date
  • Primary Contact
  • Secondary Contact
  • Complete By date
  • Comment text
  • (updates through time are recorded as historic entries)

TA Recommendation:

  • Recommendation free text
  • Recommendation date
  • Comment text
  • (updates through time are recorded as historic entries)

Task Actions

Monitor:

  • Monitor Yes/No (turn on or off)
  • Date of initial monitor event
  • Monitor frequency, sets recurring Monitor events at (eg) 6 month frequency after the last Inspection result is entered.
  • Action party, who is responsible (dropdown list)
  • Comment

Isolate:

  • Isolate Date
  • Action party responsible
  • Comment
  • (Isolate is more a record of an action than a Task)

Replacement:

  • Choose Replacement type from selection
  • Replace by Date
  • Replace Date confirmed: Yes/No
  • Replacement Date
  • Replacement Order number
  • Action party dropdown selector
  • Comment
  • Installed: Yes/No
  • Install Date
  • (updates recorded as historic information)

Permanent Repair:

  • Choose Repair type from selection
  • Repair by Date
  • Action party dropdown selector
  • Comment
  • Repaired: Yes/No
  • Repair Date
  • (updates recorded as historic information)

Temporary Repair:

  • Choose Repair type from selection
  • Repair by Date
  • Deviation Number
  • Use Deviation Expiry Date: Yes/No
  • Deviation Expiry Date
  • Action party dropdown selector
  • Comment
  • Repaired: Yes/No
  • Repair Date
  • Update Expiry Date: Yes/No
  • Expiry Date
  • (updates recorded as historic information)

Fitness for Service Assessment:

  • Date required
  • Action Party dropdown selector
  • Comment
  • Result Achieved: Yes/No
  • Result Date
  • Result: Pass/Fail

Fabric Maintenance:

  • Item part number (free text)
  • Use Due date: Yes/No
  • Due date
  • Action Party dropdown selector
  • Comment
  • Completed: Yes/No
  • Completed Date

Other:

  • Task – free text
  • Complete By Date
  • Action Party dropdown selector
  • Comment
  • Completed: Yes/No
  • Complete Date

Inspection Information

  1. Inspection report numbers
  2. Inspection technique, eg: GVI, CVI, RAD, UT etc
  3. Nominal Wall thickness
  4. Retiral wall thickness
  5. Thickness to Retiral (auto calculated from inspection data entered)
  6. Test points
  7. Test measurement, per point
  8. Date of test
  9. Comments

Documents & Images

  1. Upload document of type example: Report, Survey, Design Calc, ISO drawing etc
  2. Create date of document
  3. Document description
  4. Upload Image of type example: Pre Repair, Post Repair, Location etc
  5. Create date of Image
  6. Image description

Reports

Summary Report

Lists standard generic reports to display pre-formatted results for expired repairs, upcoming monitor/inspections, expiring deviations, records not yet reviewed. And selection of highlight reports to illustrate critical events upcoming, with results displayed pre-filtered in the main search page.

Action Party Report

Displays tasks allocated per action party, with indicators to establish when the tasks will fall due to be complete and how many are overdue, based on task complete by dates.

Monthly Summary

A cross section of data highlighting trends in key performance, automatically calculated at month end.

ONE aset defect anomaly repair system

pipeline defect management system